Coiled Tubing Technology
Introduction of Yilong coiled tubing Service Center
Beijing YiLongHengYe Petroleum Engineering Technology Co., Ltd. coiled tubing service center was established in 2012. we currently have 5 sets Coiled Tubing units ,can provide full range service both in conventional and sour gas wells, such as gas lift, cleanout, muti-stage CoilFRAC milling, fishing, perforating, well test and velocity etc. With the help of our experienced professional team, we have created lots of remarkable achievement both in China and overseas. which have been highly recognized by our clients.
The Scope Of Yilong Coiled Tubing Service Center
Conventional well operation 1.Gas-lift 2.Wellbore Cleanout 3.Muti-Stage CoilFRAC 4.Acidizing 5.Plug Milling 6.Cutting 7.Fishing 8.Horizontal well testing and perforation 9.Set Bridge Plug 10.Completion pipe string | Sour Gas Filed Operation 1.Gas lift 2.Scale Removal 3.Water Shut off 4.Horizontal well testing |
Brief Introduction to
Coiled Tubing Unit (CTU)
Equipment advantages
Currently we have 5 sets of advance Coiled Tubing Units with the following aspects:
1.Advanced HR680&ZRT-100K injector;
2.Can easily switch between 1" to 2-3/8" system ;
3.The tripping speed of coiled tubing is extensively controlled from min 0.06m/min to max 60m/min;
4.With full-featured BOP;
5.The maximal pull up force is 45 tons and the maximal set-down force is 22.5 tons ;
6.Equipment meet NACE MR-0175 for HS Services
Simulation design
(1)Fatigue life tracking
The degree of fatigue of the coiled tubing by every ten inches and the life of each coiled tubing can be calculated by using the data collected from the Orion data acquisition system.
(2)Tubing forces
To measure the pressure and gravity of coiled tubing;
To calculate how much weight can be borne;
To calculate the force of pulling up coiled tubing in the horiz ontal well;
To calculate the force needed for fishing job.
(3)Stress
To calculate the construction safety limit in the well;
To take safety precautions when necessary according to the tubing conditions.
(4) Hydraulic simulation
To design solid particle flowback volume, tubing speed, cutting speed and fishing speed.
(5)Downhole tools configuration
In configurating downhold tools with the existing tool database or by creating specific database, users can not only manipulate the tools completely but can also save, print, input and output these downhole data.
Data acquisition
The following parameters can be collected, displayed, saved, copied and printed in the form of curves: tubing depth, tubing tripping speed, tubing weight, annulus pressure, inlet pressure, discharge volume of the injection and the cumulative injection volume at two bypass orifices.
(1)Real-time tubing forces monitoring
(2)Real-time detection over limits of tubing operation conditions
(3)Real-time tubing fatigue condition monitoring
Coiled tubing parameters
Coiled tubing specification |
1.5″Coiled tubing | 7000m | Two reels |
1.75″ Coiled tubing | 6500m | One reel |
2″ Coiled tubing | 5000m | Three reels |
2.375″ Coiled tubing | 3800m | One reel |
Matching operation tools
(1)Standard tools
①Tubing connectors: “external slip” type, “dimple-on” type and “roll-on” type.
② Motorhead assembly: double flapper check valve, releasing sub and circulating sub.
(2)Auxiliary tools
①Centralizer: bow spring, hydraulic centralizer
②Torque through knuckle joint
③Special joints: rotating joint
④Operating and cleaning
tools
⑤Bumping tools
⑥Milling tools
⑦Fishing tools
Technical Support
The company has built strategic partnerships with several large oil service enterprises and research institutions through in-depth cooperation with them, so as to supply guarantees for the company to quickly master the world’s advanced technologies and provide high quality and efficient technologies and services.
Standardized Management
Various management systems
have been established, for example: QHSE Management System, Equipment
Maintenance and Operations Procedure, Post Responsibility System and Quality
and Safety Supervision and Management System.
(1)Working procedure
specification: detailed operation procedures have been established to
standardize the admission of the materials, construction design, construction
quality management and control as well as construction safety management.
(2)“Three-standardization”
management specification: standardized site, standardized operation and
standardized management.
The Operating Performance of Coiled Tubing
From 2013 to 2014 in JiaoShiBa area, we have done nearly 40 wells continuous tubing drilled plug operation, more than 50 wells in coiled tubing perforating operation, more than 20 wells in coiled tubing salvage operation, more than 10 wells in the coiled tubing bridge plug operation, 3 wells in coiled tubing horizontal well testing operations and 3 wells in coiled tubing completion string operations. The construction success rate is 100%. Among them, the JY 12-X well drilled plug created 2100m longest horizontal segment, 26 maximum number of drill stopper construction records in domestic shale gas wells.2014, multiple oil wells in Puguang Gas Field were finished with one hundred percent successful rate by using coiled tubing equipment in this year, including 7 wells flushing de-plugging operation of high sulfur content gas well, 4 wells gas lift operation of high sulfur content gas well, 3 well water plugging operation of high sulfur content gas well. Among above deeds, both of gas lift operation and water plugging operation used in high sulfur content gas wells were implemented for the first time in Puguang gas filed area.