Coiled Tubing Technology
Introduction of Yilong coiled tubing Service Center
At present, Yilong has 28 sets of advanced coiled tubing operating equipment, the advantages are mainly reflected in the following aspects:
1. The brand is imported Hydra or Chinese high-quality brand Jereh;
2. Injection head lifting capacity from 80000lbs to 140000lbs, speed control from 0.7m/min to 58m/min, adapter type from 1.25 inch to 3.5 inch, to meet the different well environment and characteristics;
3. Meet the API standard, the material resistance to H2S in line with the NACE-MR0175 standard, different pressure and different working conditions of wellhead blowout prevention device;
4. Intelligent operation, real-time displayed and recorded operation parameters, force analysis and fatigue simulation.
The Scope Of Yilong Coiled Tubing Service Center
Conventional well operation 1.Gas-lift 2.Wellbore Cleanout 3.Muti-Stage CoilFRAC 4.Acidizing 5.Plug Milling 6.Cutting 7.Fishing 8.Horizontal well testing and perforation 9.Set Bridge Plug 10.Completion pipe string | Sour Gas Filed Operation 1.Gas lift 2.Scale Removal 3.Water Shut off 4.Horizontal well testing |
Brief Introduction to
Coiled Tubing Unit (CTU)
Equipment advantages
Currently we have 5 sets of advance Coiled Tubing Units with the following aspects:
1.Advanced HR680&ZRT-100K injector;
2.Can easily switch between 1" to 2-3/8" system ;
3.The tripping speed of coiled tubing is extensively controlled from min 0.06m/min to max 60m/min;
4.With full-featured BOP;
5.The maximal pull up force is 45 tons and the maximal set-down force is 22.5 tons ;
6.Equipment meet NACE MR-0175 for HS Services
Simulation design
(1)Fatigue life tracking
The degree of fatigue of the coiled tubing by every ten inches and the life of each coiled tubing can be calculated by using the data collected from the Orion data acquisition system.
(2)Tubing forces
To measure the pressure and gravity of coiled tubing;
To calculate how much weight can be borne;
To calculate the force of pulling up coiled tubing in the horiz ontal well;
To calculate the force needed for fishing job.
(3)Stress
To calculate the construction safety limit in the well;
To take safety precautions when necessary according to the tubing conditions.
(4) Hydraulic simulation
To design solid particle flowback volume, tubing speed, cutting speed and fishing speed.
(5)Downhole tools configuration
In configurating downhold tools with the existing tool database or by creating specific database, users can not only manipulate the tools completely but can also save, print, input and output these downhole data.
Data acquisition
The following parameters can be collected, displayed, saved, copied and printed in the form of curves: tubing depth, tubing tripping speed, tubing weight, annulus pressure, inlet pressure, discharge volume of the injection and the cumulative injection volume at two bypass orifices.
(1)Real-time tubing forces monitoring
(2)Real-time detection over limits of tubing operation conditions
(3)Real-time tubing fatigue condition monitoring
Coiled tubing parameters
Coiled tubing specification |
1.5″Coiled tubing | 7000m | Two reels |
1.75″ Coiled tubing | 6500m | One reel |
2″ Coiled tubing | 5000m | Three reels |
2.375″ Coiled tubing | 3800m | One reel |
Matching operation tools
(1)Standard tools
①Tubing connectors: “external slip” type, “dimple-on” type and “roll-on” type.
② Motorhead assembly: double flapper check valve, releasing sub and circulating sub.
(2)Auxiliary tools
①Centralizer: bow spring, hydraulic centralizer
②Torque through knuckle joint
③Special joints: rotating joint
④Operating and cleaning
tools
⑤Bumping tools
⑥Milling tools
⑦Fishing tools
Technical Support
The company has built strategic partnerships with several large oil service enterprises and research institutions through in-depth cooperation with them, so as to supply guarantees for the company to quickly master the world’s advanced technologies and provide high quality and efficient technologies and services.
Standardized Management
Various management systems
have been established, for example: QHSE Management System, Equipment
Maintenance and Operations Procedure, Post Responsibility System and Quality
and Safety Supervision and Management System.
(1)Working procedure
specification: detailed operation procedures have been established to
standardize the admission of the materials, construction design, construction
quality management and control as well as construction safety management.
(2)“Three-standardization”
management specification: standardized site, standardized operation and
standardized management.
The Operating Performance of Coiled Tubing
In various oilfields across China, particularly in the southwest shale gas region, we offer coiled tubing services at different stages of oilfield development and extraction, accumulating over 2200 well interventions.
We provide coiled tubing services at an oilfield in Kazakhstan, primarily involving coiled tubing drag fracturing services and velocity string services, with over 1500 well interventions to date.
In Algeria, we have provided coiled tubing services for consortia and national oil companies, with a track record of 6 years and over 3500 well interventions.