Drilling engineering services
Scope of services:
Powerful drilling ability
YLHY can provide a series of drilling rigs for 2000m to 9000m well’s drilling.Annual maximum drilling capability can reach 400,000meters.By which we can complete the project of drilling and completion service for wells whose TD are less than 9,000m,including vertical wells, horizontal wells, cluster wells and multi-lateral wells
Adaptable to complicated formation conditions
Full geological conditions
Drilling
well in diversified oilfield such as mountain, plain, desert, swamp and shallow
sea.
• Optimized and fast-speed drilling
• A drilling technology of only one run to drill
completely second section of a directional
well
• Drilling technology for formations with vary pressure coefficients in one borehole
• Large
and deep hole( 17-1/2’’ section and
4300m accumulated depth) drilling
technology
• Drilling technology in tremendous thick and high
pressure salt-gypsum formation
• Narrow
window ECD reservoir drilling technology
• Leak
prevention and Plugging techniques of
well-control technology
Integrated drilling services
Services summarized
Beijing
YilongHengye Oil Engineering Technical Co., Ltd. (Yilong),as a supplier of technology, integrated
project management and information solutions to customers working in the oil
and gas industry, provide from geological design and drilling engineering
design to drilling, directional drilling, well
completion and oil &gas testing such
integrated engineering services.
Scope of services:
• Geological
design
• Drilling
engineering design
• Preliminary engineering for spudding
• Drilling services
• Logging and mud-logging services
• Well cementing
• Directional drilling services
• Drilling and completion fluid
services
• Coring services
• Well completion services
• Drilling waste management
Achievement
YLHY spread drilling engineering services not only in JiaoShi area and XinJiang province ,China
but also overseas , such as Kazakhstan ,Algeria,Middle East. Until Oct,2015., totally more than 100 wells have been drilled
successfully and accumulated footage is 400,000 meters