In
the evaluation letter, Production Management Department of Party A, Zhongyuan
Oilfield Puguang Branch carries out an objective evaluation in terms of team
outlook, equipment management, safety awareness, work efficiency and technical
levels represented in the processing construction tasks for the wellholes of 3
wells, such as, P3X\P2X, of our company, Party A unit thinks that:
In
terms of team outlook, coiled tubing operation team I of our company overcomes
the difficulties of hot and wet weather in Puguang area, carries out the
construction for 24 consecutive hours. And the team can respect the
coordination and command of Party A, communicate with Party A timely and
cooperate with the cooperative party, Zhongyuan underground closely. The team
members can bear hardships and stand hard work and have good team spirit.
In
terms of equipment management, team I can strictly implement the equipment
management principle of “proactive maintenance, intermediate inspection,
afterwards maintenance”, achieving the fine equipment management; before the
commencement, equipment is well maintained, avoiding the equipment failure and
ensuring the continuity of construction; in construction, regular inspection
eliminates the abnormal phenomenon of equipment: after a well is completed,
team I will spend one day carrying out the comprehensive inspection and
replacement of the key parts of equipment, to ensure the equipment in good
condition.
In
terms of safety awareness, the construction team has strong safety
consciousness. A safety technical disclosure meeting is held for the start of
each well, to clear security risk and set up preventative measures. And a
targeted safety emergency drill is carried out, improving the safety skills of
all members. The team can strictly implement the shift relief system, ensuring
the continuity of construction safety.
In
terms of work efficiency, the construction is fully prepared, and the work runs
ahead. 24 hours of continuous construction and high work efficiency,
effectively reduce the operation time of production: it only takes 10 days from
the start acceptance on June 10 to completion on June 19; rinsing and
construction tasks for three wells are completed safely, effectively with high
quality.
In
terms of technical levels, the construction is seriously and operation stable;
the team has rigorous and meticulous work styles and
superb technical levels.
High
praise from Party A unit is the full affirmation for the relevant operation
teams of our company. We hope the team members will keep the style based on
sincerity, will not live up to Party A unit trust and normalize the high
standards of service.